Shinkansen Coupled Services Resume Following Safety Enhancements by JR East

0
f8c7de84-013f-4328-86b2-2708fa9a60d1

JR East has resumed coupled services for Tohoku Shinkansen trains after a decoupling incident. To prevent future occurrences, they will employ metal fittings to enhance machinery security. Normal operations are anticipated by Saturday following successful safety tests.

Service for coupled Tohoku Shinkansen trains, which connect with Akita and Yamagata Shinkansen services, has resumed following a suspension due to a decoupling incident involving train Hayabusa-Komachi No. 21. This suspension lasted until Friday, and JR East plans to fully normalize operations by Saturday.

The specific cause of the decoupling event is still under investigation. In response, JR East will implement metal fittings designed to secure essential machinery and prevent further occurrences during electrical system malfunctions. A successful test run was conducted Wednesday, assuring safety for resumed operations.

JR East’s rapid response to the decoupling incident with enhanced safety measures demonstrates a commitment to maintaining operational reliability in their Shinkansen services. With the resumption of the coupled service and the introduction of metal fittings, JR East aims to mitigate similar risks in the future, ensuring passenger safety and service continuity.

Original Source: japannews.yomiuri.co.jp

Leave a Reply

Your email address will not be published. Required fields are marked *